Dimensions |
||
Length overall, m |
81,26 |
|
Length between perpendicular, m |
71,37 |
|
Breadth overall, m |
16,29 |
|
Hull height, m |
7,2 |
|
Displacement of the vessel unloaded, t |
2632 |
|
Displacement of vessel fully loaded, t |
4430 |
|
Light draft, m |
3,6 |
|
Draft fully loaded, m |
4,75 |
|
Deadweight, t |
1367 |
|
Gross tonnage, t |
2737 |
|
Capacities |
||
Crew, person |
19 (each shift) |
|
Speed, knots |
15,3 |
|
Fresh Water, m3 |
310 |
|
Drill water, m3 |
1030 |
|
Fuel, m3 |
640 |
|
Methanol (in two portable cisterns on deck), m3 |
15 |
|
Dry Bulk tanks, m3 |
160 |
|
Diesel fuel, t |
83,7 |
|
Boiler water, t |
28,6 |
|
Deck cargo capacity, t |
600 |
|
Deck strength, ton/ m2 |
5 |
|
Clear deck area, m2 |
396,8 |
|
Clear deck area (max L x B) |
32x12,4 |
|
Fuel consumption, kg/h |
213 |
|
Oil consumption, kg/h |
3 |
|
Engine fuel, t |
284,6 |
|
Lubricating oil, t |
42,8 |
|
Fresh water, t |
109,8 |
|
Endurance |
30 |
|
General Data |
||
IMO number |
8418485 |
|
Port of registry / Call sign |
Baku / 4JAZ |
|
Purpose Of The Ship |
AHTS (Anchor Handling Towing and Supply) Vessel |
|
Type of the Ship |
All-welded, with a continuous deck, raised foredeck and superstructure in the bow section of the ship. |
|
Flag |
Azerbaijan |
|
Year built / builder |
1988, Gdansk, Poland. |
|
Class |
KM(*) L1[1] AUT2 Supply Vessel |
|
Machinery and Propulsion |
||
Main engines |
2 x 6ZL40/48 – "Zulzer" type nonreversible diesel engines with a capacity of 2 х 2650 kW (2 х 3600 BHP), 500 rpm. |
|
Main propellers |
2 x four bladed, with diameter of 3000 mm, 220 rpm, made of stainless steel, adjustable pitch propellers installed on the fixed nozzles. |
|
Propulsion system & Bow thruster |
Is installed on the bow tunnel, with the adjustable – pitch propeller, 370 rpm, 6AL 20/24 diesel, 9 model diesel engine with a capacity of 1200 KW at 1800 rpm. |
|
Diesel generator |
3 x diesel generators consisting of 6 AL 20/24 type "Zulzer" diesel with a capacity of 3 х 420 kW (3 х 570 BHP) at 750 rpm. |
|
Generator |
With a capacity of 3 x 384 kW, 750 rpm, voltage 400 V, 50 Hz. |
|
Emergency generator |
1 x 21 Z PM 31H6 type emergency diesel generator with a capacity of 90 kW (150 BHP), 1500 rpm and generator with capacity of 100 kW, 1500 rpm. |
|
Special Equipment |
||
Bollard Pull, KN (t) |
785 (80) |
|
Double-drum towing winch |
Located on the upper deck in the stern section of the superstructure. |
|
For operation of buoy systems |
There is one detachable winch with a drum capacity of 350 m long, 20 mm wire with bollard pull of 5t and four pieces of cable reel with drum capacity of 200 m long, 60 mm wire. |
|
Carriage of cargo on deck |
Guard rails made of pipes 273 mm in diameter for limitation of cargo space of which the upper side is designed for sliding of towing wire and shackles (eye rings) welded under them for the purposes of fastening of carried cargo. The deck is equipped with jacks and devices for the transport of containers. |
|
Stern Roller |
250t |
|
Bunkering and Discharge Flow Rate |
||
Fuel |
The diesel fuel system consists of two helical groove pump with a capacity of Q = 68,8 m3 per hour. Methanol, located in two portable tanks is transferred to the drilling platform by crane. Each cistern has been equipped with a pump, with a capacity of Q = 9,0 m3/m, Н = 52 m wat.st., which performs pumping of liquid into cistern of the drilling rig. |
|
Potable water |
Water pump with a capacity of 63 m3 per hour. |
|
Technical water |
Two pumps which are connected in parallel and included in the water screen system, with a capacity of 275 m3 per hour and provides pumping of 1000 tons of water during 4 hours. |
|
Dry Bulk
|
4 cisterns (tanks) (by two in the stern and the bow of the vessel), with a volume of 40 m 3. Loading and unloading is performed by means of two pneumatic – compressors, with a capacity of Q =20m3/min, and with a pressure of 0.8 mPa, established in the area of cement tanks located in the stern of the ship. |
|
The system of extinguishing of local fires on drilling rigs |
Consists of 3 fire pumps with a capacity of Q = 160 m3/hour, Н = 65 m water st.., two auxiliary pumps with a capacity of Q = 160 m3 / hour, Н = 65 m water. st. and four master stream water – foam nozzles with a capacity of Q = 140 m3 / hour. |
|
Safety Equipment |
||
Life rafts |
4 x 20 person |
|
Fast rescue boat |
1pcs |
|
Life buoy |
8 pcs |
|
Life jacket |
36 pcs |
|
Immersion suit |
36pcs |
|
Embarkation ladder |
2pcs |
|
Accommodation |
||
Maximum POB as per LSA |
34 |
|
1 berth cabin |
6 |
|
2 berth cabins |
8 |
|
4 berth cabins |
3 |
|
Navigation Equipment |
||
MF/HF FS-2570 – 1pcs; VHF.FM-8800 – 2 pcs; Sailor RT-2048 – 2pcs; R/buy MT-401- 1pcs; VHF. McMurdo R1 – 3pcs, SART McMurdo S4 – 2 pcs; VHF. ICOM IC-M32 – 2 pcs; UAIS FA-150 – 1pcs; RADAR Racal Decca – 1pcs; RADAR MDC-2910 – 1pcs; INM-C Felcom-15 -1pcs; INM. TT-3000SSA – 1pcs. |